Note: Use these costs as a guide for line extension and service agreement, actual cost may vary.

Service Installation Fee:        $500.00

Primary Line - Underground (from the nearest distribution power line to your transformer)
Single Phase   First 500 feet   $7.00/ft.
  501 - 1000 feet   $4.00/ft.
  All footage over 1000 ft.   $3.00/ft.
  Road bore   $7.00/ft.
Three Phase underground actual costs
May be additional charges for clearing or purchasing right-of-way, cost for road crossing, installation in frozen ground or rocks and/or any required easements.

Primary Line - Overhead
Single Phase   First 500 feet   $5.00/ft.
  All footage over 500 feet   $3.00/ft.
Three Phase overhead actual costs
May be additional charges for clearing or purchasing right-of-way, cost for road crossing, installation in frozen ground or rocks and/or any required easements.

Secondary Service (wiring from the transformer to the meter up through 4/0 triplex)
Single Phase Overhead $5.00/ft
Underground $7.00/ft
Three Phase Cost of labor and conductor Actual Cost

Temporary Service:       $150.00
Single Phase Transformer     $300.00
Three Phase Transformer Overhead Actual Cost
Underground Pad Mount Actual Cost

Metering - Overhead and Underground

Single Phase   200 Amp or less   $375.00
Single Phase Over 200 Amp and Current Transformers
Cost of labor and material
Actual Cost
Three Phase Cost of labor and material Actual Cost

Breakers Used in Meter Pedestals
Old Midwest Pedestals - Prior to 1997 Cat.# M202EBOP6HP
Midwest #
CB-2-101B 100 Amp bolt in
CB-2-151B 150 Amp bolt in
CB-2-201B 200 Amp bolt in

Milbank Pedestal - 1997-1999 Cat.# U3730-O
GE #
THQL21100 100 Amp snap in
TQDL21200 200 Amp snap in

New Midwest Pedestal - 1999 Cat.# R282E1P6H
Midwest # CB4200H 200 Amp snap in
  CB4150H 150 Amp snap In
  CB2100H 100 Amp snap In
GE # THQMV200WLBP 200 Amp snap in
  THQMV150WLBP 150 Amp snap in
  THQMV100WLBP 100 Amp snap in
Additional spaces available for two GE double-pole breakers or four single-pole.

Security Light
100-watt sodium vapor (unmetered)   $6.50/mo.
100-watt sodium vapor (metered)   $4.50/mo.

Construction Notes

  1. The decision as to the type of construction, overhead or underground, single phase or multi-phase, shall be the discretion of the Cooperative.
  2. In the event facilities are requested to be installed in frozen ground, rock or in areas in which excavation is abnormal and difficult, the member/consumer/developer or contractor shall pay an additional amount equal to the extra cost of installation due to such conditions.
  3. The cost of clearing right-of-way of trees and heavy brush and/or the purchase of right-of-way required to make an extension shall be considered in establishing the minimum charge.
  4. An additional contribution in aid to construction may be requested whenever the actual cost of construction exceeds the standard or estimated cost by 130 percent.
  5. Existing Line Rights: During the first five years from the installation of the line, whenever new consumers are added to the primary line, the cost of construction will be recomputed based on the number of consumers. The individual contributions in aid to construction will also be recomputed based on the greater number of participants. Members with contributions higher than the new computed amounts will receive a refund of the difference.

 

Home Return to Vernon Electrical Cooperative Home Page.