Note: Use these costs as a guide for line extension and service agreement, actual cost may vary.
Service Installation Fee:
$500.00
Primary Line - Underground (from the nearest distribution power line to
your transformer)
| Single Phase |
|
First 500 feet |
|
$7.00/ft. |
| |
501 - 1000 feet |
|
$4.00/ft. |
| |
All footage over 1000 ft. |
|
$3.00/ft. |
| |
Road bore |
|
$7.00/ft. |
| Three Phase |
|
underground actual costs |
|
|
May be additional charges for clearing or purchasing right-of-way, cost for
road crossing, installation in frozen ground or rocks and/or any required
easements. |
Primary Line - Overhead
| Single Phase |
|
First 500 feet |
|
$5.00/ft. |
|
|
All footage over 500 feet |
|
$3.00/ft. |
| Three Phase |
|
overhead actual costs |
|
|
May be additional charges for clearing or purchasing right-of-way, cost for
road crossing, installation in frozen ground or rocks and/or any required
easements. |
Secondary Service (wiring from the transformer to the meter
up through 4/0 triplex)
| Single Phase |
|
Overhead
| |
$5.00/ft |
|
|
Underground
| |
$7.00/ft |
| Three Phase |
|
Cost of labor and conductor |
|
Actual Cost |
Temporary Service: $150.00
| Single Phase Transformer |
|
|
|
$300.00 |
| Three Phase Transformer |
|
Overhead |
Actual Cost |
|
|
Underground Pad Mount |
Actual Cost |
Metering - Overhead and Underground
|
| Single Phase |
|
200 Amp or less |
|
$375.00 |
| Single Phase |
|
Over 200 Amp and Current Transformers
Cost of labor and material |
|
Actual Cost |
| Three Phase |
|
Cost of labor and material |
|
Actual Cost |
Breakers Used in Meter Pedestals
Old Midwest Pedestals - Prior to 1997 Cat.# M202EBOP6HP
| Midwest # |
|
|
| CB-2-101B |
|
100 Amp bolt in |
| CB-2-151B |
|
150 Amp bolt in |
| CB-2-201B |
|
200 Amp bolt in |
Milbank Pedestal - 1997-1999 Cat.# U3730-O
| GE # |
|
|
| THQL21100 |
|
100 Amp snap in |
| TQDL21200 |
|
200 Amp snap in |
New Midwest Pedestal - 1999 Cat.# R282E1P6H
| Midwest # |
CB4200H |
200 Amp snap in |
| |
CB4150H |
150 Amp snap In |
| |
CB2100H |
100 Amp snap In |
| GE # |
THQMV200WLBP |
200 Amp snap in |
| |
THQMV150WLBP |
150 Amp snap in |
| |
THQMV100WLBP |
100 Amp snap in |
| Additional spaces available for two GE double-pole breakers or four single-pole. |
Security Light
| 100-watt sodium vapor (unmetered) |
|
$6.50/mo. |
| 100-watt sodium vapor (metered) |
|
$4.50/mo. |
|
|
|
|
|
|
Construction Notes
- The decision as to the type of construction, overhead or underground, single phase or multi-phase,
shall be the discretion of the Cooperative.
- In the event facilities are requested to be installed in frozen ground, rock or in areas in which
excavation is abnormal and difficult, the member/consumer/developer or contractor shall pay an
additional amount equal to the extra cost of installation due to such conditions.
- The cost of clearing right-of-way of trees and heavy brush and/or the purchase of right-of-way
required to make an extension shall be considered in establishing the minimum charge.
- An additional contribution in aid to construction may be requested whenever the actual cost of
construction exceeds the standard or estimated cost by 130 percent.
- Existing Line Rights: During the first five years from the installation of the line, whenever new
consumers are added to the primary line, the cost of construction will be recomputed based on the
number of consumers. The individual contributions in aid to construction will also be recomputed
based on the greater number of participants. Members with contributions higher than the new computed